0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Wu, Haiato / Zhong, Botao / Li, Heng / Guo, Jiadong / Wang, Yuhang (2021): On-Site Construction Quality Inspection Using Blockchain and Smart Contracts. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 6 (novembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000967

  2. Li, Heng (1996): Neural network models for intelligent support of mark‐up estimation. Dans: Engineering, Construction and Architectural Management, v. 3, n. 1 (janvier 1996).

    https://doi.org/10.1108/eb021023

  3. Li, Heng / Cheng, Eddie W. L. / Love, Peter E. D. (2000): Partnering research in construction. Dans: Engineering, Construction and Architectural Management, v. 7, n. 1 (janvier 2000).

    https://doi.org/10.1108/eb021134

  4. Wang, Fan / Li, Heng (2021): On the use of the maximum entropy method for reliability evaluation involving stochastic process modeling. Dans: Structural Safety, v. 88 (janvier 2021).

    https://doi.org/10.1016/j.strusafe.2020.102028

  5. Umer, Waleed / Li, Heng / Yantao, Yu / Antwi-Afari, Maxwell Fordjour / Anwer, Shahnawaz / Luo, Xiaochun (2020): Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures. Dans: Automation in Construction, v. 112 (avril 2020).

    https://doi.org/10.1016/j.autcon.2020.103079

  6. Zhong, Botao / Li, Heng / Luo, Hanbin / Zhou, Jingyang / Fang, Weili / Xing, Xuejiao (2020): Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images. Dans: Journal of Construction Engineering and Management, v. 146, n. 4 (avril 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001767

  7. Zhang, Hong / Jin, Rui / Li, Heng / Skibniewski, Mirosław J. (2018): Pavement Maintenance–Focused Decision Analysis on Concession Periods of PPP Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 1 (janvier 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000568

  8. Fan, Hongqin / Xue, Fan / Li, Heng (2015): Project-Based As-Needed Information Retrieval from Unstructured AEC Documents. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 1 (janvier 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000341

  9. Li, Heng (1995): Neural networks for construction cost estimation. On the positive side neural networks demonstrate many features that are coherent with the nature of cost estimation. Major strengths include their ability to self‐organize knowledge from training data, their ability to generate results from incomplete information and their ability to cope with complex relations. These largely resemble the way human estimators develop expertize through experience. Dans: Building Research & Information, v. 23, n. 5 ( 1995).

    https://doi.org/10.1080/09613219508727476

  10. Li, Heng (1995): A new connectionist approach to implementing knowledge‐based construction performance management systems — conceptual design. Explores how connectionist models can be adapted to model important aspects of construction diagnostic processes. Dans: Building Research & Information, v. 23, n. 3 ( 1995).

    https://doi.org/10.1080/09613219508727449

  11. Zhong, Botao / Hei, Yongjian / Li, Heng / Rose, Timothy / Luo, Hanbin (2019): Patent Cooperative Patterns and Development Trends of Chinese Construction Enterprises: A Network Analysis. Dans: Journal of Civil Engineering and Management, v. 25, n. 3 (juin 2019).

    https://doi.org/10.3846/jcem.2019.8137

  12. Li, Heng / Wang, Di / Chen, Jiayu / Luo, Xiaochun / Li, Jue / Xing, Xuejiao (2019): Pre-service fatigue screening for construction workers through wearable EEG-based signal spectral analysis. Dans: Automation in Construction, v. 106 (octobre 2019).

    https://doi.org/10.1016/j.autcon.2019.102851

  13. Kim, Min-Koo / Wang, Qian / Li, Heng (2019): Non-contact sensing based geometric quality assessment of buildings and civil structures: A review. Dans: Automation in Construction, v. 100 (avril 2019).

    https://doi.org/10.1016/j.autcon.2019.01.002

  14. Zhang, Hong / Li, Heng / Tam, C. M. (2006): Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling. Dans: Journal of Computing in Civil Engineering, v. 20, n. 2 (mars 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:2(141)

  15. Li, Heng / Chan, Greg / Skitmore, Martin (2012): Multiuser Virtual Safety Training System for Tower Crane Dismantlement. Dans: Journal of Computing in Civil Engineering, v. 26, n. 5 (septembre 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000170

  16. Jin, Zhigang / Deng, Fei / Li, Heng / Skitmore, Martin (2013): Practical Framework for Measuring Performance of International Construction Firms. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000718

  17. Faniran, Olusegun O. / Love, Peter E. D. / Li, Heng (1999): Optimal Allocation of Construction Planning Resources. Dans: Journal of Construction Engineering and Management, v. 125, n. 5 (septembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:5(311)

  18. Umer, Waleed / Li, Heng / Szeto, Grace Pui Yuk / Wong, Arnold Y. L. (2018): Proactive Safety Measures: Quantifying the Upright Standing Stability after Sustained Rebar Tying Postures. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001458

  19. Li, Heng / Chan, Neo / Huang, Ting / Guo, H. L. / Lu, Weisheng / Skitmore, Martin (2009): Optimizing construction planning schedules by virtual prototyping enabled resource analysis. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).

    https://doi.org/10.1016/j.autcon.2009.04.002

  20. Li, Heng (1998): Petri net as a formalism to assist process improvement in the construction industry. Dans: Automation in Construction, v. 7, n. 4 (mai 1998).

    https://doi.org/10.1016/s0926-5805(98)00051-x

  21. Zhang, Hong / Li, Xiaodong / Li, Heng / Huang, Fulai (2005): Particle swarm optimization-based schemes for resource-constrained project scheduling. Dans: Automation in Construction, v. 14, n. 3 (juin 2005).

    https://doi.org/10.1016/j.autcon.2004.08.006

  22. Dong, Chao / Li, Heng / Luo, Xiaochun / Ding, Lieyun / Siebert, Joanna / Luo, Hanbin (2018): Proactive struck-by risk detection with movement patterns and randomness. Dans: Automation in Construction, v. 91 (juillet 2018).

    https://doi.org/10.1016/j.autcon.2018.03.021

  23. Cao, Dongping / Wang, Guangbin / Li, Heng / Skitmore, Martin / Huang, Ting / Zhang, Weiyu (2015): Practices and effectiveness of building information modelling in construction projects in China. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.014

  24. Li, Heng / Lu, Miaojia / Chan, Greg / Skitmore, Martin (2015): Proactive training system for safe and efficient precast installation. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.010

  25. Zhang, Hong / Yang, Fei / Li, Yang / Li, Heng (2015): Predicting profitability of listed construction companies based on principal component analysis and support vector machine—Evidence from China. Dans: Automation in Construction, v. 53 (mai 2015).

    https://doi.org/10.1016/j.autcon.2015.03.001

  26. Kong, Liulin / Li, Heng / Luo, Hanbin / Ding, Lieyun / Luo, Xiaochun / Skitmore, Martin (2017): Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates. Dans: Automation in Construction, v. 81 (septembre 2017).

    https://doi.org/10.1016/j.autcon.2017.03.016

  27. Zhang, Hong / Li, Heng / Tam, C. M. (2006): Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(259)

  28. Zhang, Hong / Tam, C. M. / Li, Heng / Shi, Jonathan Jingsheng (2006): Particle Swarm Optimization-Supported Simulation for Construction Operations. Dans: Journal of Construction Engineering and Management, v. 132, n. 12 (décembre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1267)

  29. Zhang, Hong / Li, Heng (2010): Multi‐objective particle swarm optimization for construction time‐cost tradeoff problems. Dans: Construction Management and Economics, v. 28, n. 1 (janvier 2010).

    https://doi.org/10.1080/01446190903406170

  30. Li, Yongkui / Hu, Yi / Xia, Bo / Skitmore, Martin / Li, Heng (2018): Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects. Dans: Automation in Construction, v. 95 (novembre 2018).

    https://doi.org/10.1016/j.autcon.2018.07.021

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine