0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Wu, Yi / Xu, Fang / Wu, Xueting / Jiao, Yuyong / Sun, Tao / Li, Zhiwei / Yang, Fan / Li, Heng / Li, Bin / Xu, Jin / Chen, Shengying / Liu, Yamei / Zhu, Jing (2024): Retardation mechanism of phosphogypsum in phosphogypsum-based excess-sulfate cement. Dans: Construction and Building Materials, v. 428 (mai 2024).

    https://doi.org/10.1016/j.conbuildmat.2024.136293

  2. Zhang, Yuxuan / Chen, Junyu / Liu, Hexu / Chen, Yuan / Xiao, Bo / Li, Heng (2024): Recent advancements of human-centered design in building engineering: A comprehensive review. Dans: Journal of Building Engineering, v. 84 (mai 2024).

    https://doi.org/10.1016/j.jobe.2024.108529

  3. Xiao, Lei / Hua, Jianmin / Li, Heng / Xue, Xuanyi / Wang, Neng / Wang, Fei (2022): Quantitative analysis on post–fire–resistant performance of high–strength steel plate girders using LSTM. Dans: Journal of Constructional Steel Research, v. 199 (décembre 2022).

    https://doi.org/10.1016/j.jcsr.2022.107588

  4. Li, Fangxin / Li, Heng / Kim, Min‐Koo (2022): Registration‐free point cloud generation technique using rotating mirrors. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 37, n. 2 (4 janvier 2022).

    https://doi.org/10.1111/mice.12707

  5. Wang, Fan / Li, Heng / Zhang, Qi-Ling (2017): Response–Surface–Based Embankment Reliability under Incomplete Probability Information. Dans: International Journal of Geomechanics, v. 17, n. 12 (décembre 2017).

    https://doi.org/10.1061/(asce)gm.1943-5622.0001017

  6. Xu, Zhao / Zayed, Tarek / Lin, Yi-Hsin / Wang, Shaozhe / Li, Heng (2020): Relationship between Social Media and ASCE Code of Ethics: Review and Case-Based Discussion. Dans: Journal of Civil Engineering Education, v. 146, n. 2 (avril 2020).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000005

  7. Umer, Waleed / Li, Heng / Yantao, Yu / Antwi-Afari, Maxwell Fordjour / Anwer, Shahnawaz / Luo, Xiaochun (2020): Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures. Dans: Automation in Construction, v. 112 (avril 2020).

    https://doi.org/10.1016/j.autcon.2020.103079

  8. Cao, Dongping / Li, Heng / Wang, Guangbin / Luo, Xiaochun / Tan, Dan (2018): Relationship Network Structure and Organizational Competitiveness: Evidence from BIM Implementation Practices in the Construction Industry. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000600

  9. Zhang, Hong / Jin, Rui / Li, Heng / Skibniewski, Mirosław J. (2018): Pavement Maintenance–Focused Decision Analysis on Concession Periods of PPP Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 1 (janvier 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000568

  10. Fan, Hongqin / Xue, Fan / Li, Heng (2015): Project-Based As-Needed Information Retrieval from Unstructured AEC Documents. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 1 (janvier 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000341

  11. Li, Heng / Chen, Zhen / Wong, Conrad T. C. / Love, Peter E. D. (2002): A quantitative approach to construction pollution control based on resource levelling. Dans: Construction Innovation, v. 2, n. 2 (septembre 2002).

    https://doi.org/10.1108/14714170210814694

  12. Li, Heng / Wang, Di / Chen, Jiayu / Luo, Xiaochun / Li, Jue / Xing, Xuejiao (2019): Pre-service fatigue screening for construction workers through wearable EEG-based signal spectral analysis. Dans: Automation in Construction, v. 106 (octobre 2019).

    https://doi.org/10.1016/j.autcon.2019.102851

  13. Zhang, Hong / Yan, Xuzhong / Li, Heng / Jin, Rui / Fu, HongFeng (2019): Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction. Dans: Journal of Construction Engineering and Management, v. 145, n. 3 (mars 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001629

  14. Luo, Xiaochun / Li, Heng / Cao, Dongping / Dai, Fei / Seo, JoonOh / Lee, SangHyun (2018): Recognizing Diverse Construction Activities in Site Images via Relevance Networks of Construction-Related Objects Detected by Convolutional Neural Networks. Dans: Journal of Computing in Civil Engineering, v. 32, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000756

  15. Zhang, Hong / Li, Heng / Tam, C. M. (2006): Permutation-Based Particle Swarm Optimization for Resource-Constrained Project Scheduling. Dans: Journal of Computing in Civil Engineering, v. 20, n. 2 (mars 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:2(141)

  16. Jin, Zhigang / Deng, Fei / Li, Heng / Skitmore, Martin (2013): Practical Framework for Measuring Performance of International Construction Firms. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000718

  17. Umer, Waleed / Li, Heng / Szeto, Grace Pui Yuk / Wong, Arnold Y. L. (2018): Proactive Safety Measures: Quantifying the Upright Standing Stability after Sustained Rebar Tying Postures. Dans: Journal of Construction Engineering and Management, v. 144, n. 4 (avril 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001458

  18. Li, Heng / Chan, Greg / Wong, Johnny Kwok Wai / Skitmore, Martin (2016): Real-time locating systems applications in construction. Dans: Automation in Construction, v. 63 (mars 2016).

    https://doi.org/10.1016/j.autcon.2015.12.001

  19. Li, Heng (1998): Petri net as a formalism to assist process improvement in the construction industry. Dans: Automation in Construction, v. 7, n. 4 (mai 1998).

    https://doi.org/10.1016/s0926-5805(98)00051-x

  20. Cao, J. / Chan, Jackie Y. K. / Li, Heng / Mahdjoubi, Lamine / Love, Peter E. D. (2001): REALMEDIA: providing multimedia-based real-estate services through the Internet. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001).

    https://doi.org/10.1016/s0926-5805(99)00033-3

  21. Dong, Chao / Li, Heng / Luo, Xiaochun / Ding, Lieyun / Siebert, Joanna / Luo, Hanbin (2018): Proactive struck-by risk detection with movement patterns and randomness. Dans: Automation in Construction, v. 91 (juillet 2018).

    https://doi.org/10.1016/j.autcon.2018.03.021

  22. Cao, Dongping / Wang, Guangbin / Li, Heng / Skitmore, Martin / Huang, Ting / Zhang, Weiyu (2015): Practices and effectiveness of building information modelling in construction projects in China. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.014

  23. Li, Heng / Lu, Miaojia / Chan, Greg / Skitmore, Martin (2015): Proactive training system for safe and efficient precast installation. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.010

  24. Song, Jiqiang / Su, Feng / Li, Heng / Cai, Shijie (2002): Raster to vector conversion of construction engineering drawings. Dans: Automation in Construction, v. 11, n. 5 (août 2002).

    https://doi.org/10.1016/s0926-5805(01)00069-3

  25. Zhang, Hong / Yang, Fei / Li, Yang / Li, Heng (2015): Predicting profitability of listed construction companies based on principal component analysis and support vector machine—Evidence from China. Dans: Automation in Construction, v. 53 (mai 2015).

    https://doi.org/10.1016/j.autcon.2015.03.001

  26. Lu, Ming / Li, Heng (2003): Resource-Activity Critical-Path Method for Construction Planning. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(412)

  27. Love, Peter E. D. / Li, Heng (2000): Quantifying the causes and costs of rework in construction. Dans: Construction Management and Economics, v. 18, n. 4 (juin 2000).

    https://doi.org/10.1080/01446190050024897

  28. Li, Heng / Lu, Weisheng / Huang, Ting (2009): Rethinking project management and exploring virtual design and construction as a potential solution. Dans: Construction Management and Economics, v. 27, n. 4 (avril 2009).

    https://doi.org/10.1080/01446190902838217

  29. Li, Heng / Guo, H. L. / Skitmore, Martin / Huang, Ting / Chan, K. Y. N. / Chan, Greg (2011): Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong. Dans: Construction Management and Economics, v. 29, n. 3 (mars 2011).

    https://doi.org/10.1080/01446193.2010.545994

  30. Li, Yongkui / Hu, Yi / Xia, Bo / Skitmore, Martin / Li, Heng (2018): Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects. Dans: Automation in Construction, v. 95 (novembre 2018).

    https://doi.org/10.1016/j.autcon.2018.07.021

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine