0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emad / Rashidi, Ali / Li, Heng (2023): Multi-objective optimization of shading devices using ensemble machine learning and orthogonal design of experiments. Dans: Energy and Buildings, v. 283 (mars 2023).

    https://doi.org/10.1016/j.enbuild.2023.112840

  2. Yu, Jiangjiang / Zhang, Boshan / Chen, Weizhen / Liu, Hang / Li, Heng (2022): Multi-scale study on interfacial bond failure between normal concrete (NC) and ultra-high performance concrete (UHPC). Dans: Journal of Building Engineering, v. 57 (octobre 2022).

    https://doi.org/10.1016/j.jobe.2022.104808

  3. Li, Heng / Xu, Fang / Li, Bin / Sun, Tao / Huang, Xiaoming / Zhu, Jing / Peng, Chao / Lin, Juntao / Chen, Zongwu (2022): Investigation on mechanical properties of excess-sulfate phosphogypsum slag cement: From experiments to molecular dynamics simulation. Dans: Construction and Building Materials, v. 315 (janvier 2022).

    https://doi.org/10.1016/j.conbuildmat.2021.125685

  4. Love, Peter E. D. / Irani, Zahir / Cheng, Eddie / Li, Heng (2002): A model for supporting inter‐organizational relations in the supply chain. Dans: Engineering, Construction and Architectural Management, v. 9, n. 1 (janvier 2002).

    https://doi.org/10.1108/eb021202

  5. Wang, Liping / Li, Heng / Zou, Xuecheng / Shen, Xubang (2015): Lighting system design based on a sensor network for energy savings in large industrial buildings. Dans: Energy and Buildings, v. 105 (octobre 2015).

    https://doi.org/10.1016/j.enbuild.2015.07.053

  6. Li, Xiaoying / Li, Heng / Cao, Dongping / Tang, Yixuan / Luo, Xiaochun / Wang, Guangbin (2019): Modeling Dynamics of Project-Based Collaborative Networks for BIM Implementation in the Construction Industry: Empirical Study in Hong Kong. Dans: Journal of Construction Engineering and Management, v. 145, n. 12 (décembre 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001726

  7. Sepasgozar, Samad M. E. / Davis, Steven R. / Li, Heng / Luo, Xianrui (2018): Modeling the Implementation Process for New Construction Technologies: Thematic Analysis Based on Australian and U.S. Practices. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000608

  8. Cao, Dongping / Li, Heng / Wang, Guangbin / Zhang, Wenjuan (2016): Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000453

  9. Guo, H. L. / Li, Heng / Skitmore, Martin (2010): Life-Cycle Management of Construction Projects Based on Virtual Prototyping Technology. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(41)

  10. Xiao, Xue / Wang, Fan / Li, Heng / Skitmore, Martin (2018): Modelling the Stochastic Dependence Underlying Construction Cost and Duration. Dans: Journal of Civil Engineering and Management, v. 24, n. 6 (octobre 2018).

    https://doi.org/10.3846/jcem.2018.5712

  11. Zhong, Botao / Wu, Haitao / Ding, Lieyun / Love, Peter E. D. / Li, Heng / Luo, Hanbin / Jiao, Li (2019): Mapping computer vision research in construction: Developments, knowledge gaps and implications for research. Dans: Automation in Construction, v. 107 (novembre 2019).

    https://doi.org/10.1016/j.autcon.2019.102919

  12. Chen, Zhen / Li, Heng / Kong, Stephen C. W. / Xu, Qian (2005): A knowledge‐driven management approach to environmental‐conscious construction. Dans: Construction Innovation, v. 5, n. 1 (mars 2005).

    https://doi.org/10.1108/14714170510815159

  13. Cheng, Eddie W. L. / Li, Heng / Love, Peter / Irani, Zahir (2004): A learning culture for strategic partnering in construction. Dans: Construction Innovation, v. 4, n. 1 (mars 2004).

    https://doi.org/10.1108/14714170410815006

  14. Xing, Xuejiao / Li, Heng / Li, Jue / Zhong, Botao / Luo, Hanbin / Skitmore, Martin (2019): A multicomponent and neurophysiological intervention for the emotional and mental states of high-altitude construction workers. Dans: Automation in Construction, v. 105 (septembre 2019).

    https://doi.org/10.1016/j.autcon.2019.102836

  15. Yu, Yantao / Yang, Xincong / Li, Heng / Luo, Xiaochun / Guo, Hongling / Fang, Qi (2019): Joint-Level Vision-Based Ergonomic Assessment Tool for Construction Workers. Dans: Journal of Construction Engineering and Management, v. 145, n. 5 (mai 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001647

  16. Chen, Zhen / Li, Heng / Ross, Andrew / Khalfan, Malik M. / Kong, Stephen C. (2008): Knowledge-Driven ANP Approach to Vendors Evaluation for Sustainable Construction. Dans: Journal of Construction Engineering and Management, v. 134, n. 12 (décembre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:12(928)

  17. Liu, Zhi / Wang, Hongwei / Li, Heng (2018): Model of Equipment Sharing between Contractors on Construction Projects. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001485

  18. Umer, Waleed / Li, Heng / Szeto, Grace Pui Yuk / Wong, Arnold Y. L. (2017): Low-Cost Ergonomic Intervention for Mitigating Physical and Subjective Discomfort during Manual Rebar Tying. Dans: Journal of Construction Engineering and Management, v. 143, n. 10 (octobre 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001383

  19. Zhang, Hong / Li, Heng / Lu, Ming (2008): Modeling Time-Constraints in Construction Operations through Simulation. Dans: Journal of Construction Engineering and Management, v. 134, n. 7 (juillet 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(545)

  20. Wang, Shengwei / Xu, Zhengyuan / Li, Heng / Hong, Ju / Shi, Wen-zhong (2004): Investigation on intelligent building standard communication protocols and application of IT technologies. Dans: Automation in Construction, v. 13, n. 5 (septembre 2004).

    https://doi.org/10.1016/j.autcon.2004.04.008

  21. Xue, Xiaolong / Shen, Qiping / Fan, Hongqin / Li, Heng / Fan, Shichao (2012): IT supported collaborative work in A/E/C projects: A ten-year review. Dans: Automation in Construction, v. 21 (janvier 2012).

    https://doi.org/10.1016/j.autcon.2011.05.016

  22. Cheng, Feifei / Li, Heng / Wang, Y.-W. / Skitmore, Martin / Forsythe, Perry (2013): Modeling resource management in the building design process by information constraint Petri nets. Dans: Automation in Construction, v. 29 (janvier 2013).

    https://doi.org/10.1016/j.autcon.2012.08.005

  23. Zhang, Hong / Li, Yang / Li, Heng (2013): Multi-agent simulation of the dynamic evolutionary process in Chinese urban housing market based on the GIS: The case of Beijing. Dans: Automation in Construction, v. 35 (novembre 2013).

    https://doi.org/10.1016/j.autcon.2013.05.010

  24. Wang, Shuhua / Cao, Yang / Yang, Ruo Yu / Li, Heng (2002): A knowledge-based system for automatic measurement of steel reinforcement. Dans: Automation in Construction, v. 11, n. 5 (août 2002).

    https://doi.org/10.1016/s0926-5805(01)00070-x

  25. Li, Heng / Li, Xiaoying / Luo, Xiaochun / Siebert, Joanna (2017): Investigation of the causality patterns of non-helmet use behavior of construction workers. Dans: Automation in Construction, v. 80 (août 2017).

    https://doi.org/10.1016/j.autcon.2017.02.006

  26. Cheng, Eddie W. L. / Li, Heng (2006): Job Performance Evaluation for Construction Companies: An Analytic Network Process Approach. Dans: Journal of Construction Engineering and Management, v. 132, n. 8 (août 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(827)

  27. Cheng, Eddie W. / Li, Heng / Fox, Paul (2007): Job Performance Dimensions for Improving Final Project Outcomes. Dans: Journal of Construction Engineering and Management, v. 133, n. 8 (août 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:8(592)

  28. Love, Peter E. D. / Mandal, Purnendu / Smith, Jim / Li, Heng (2000): Modelling the dynamics of design error induced rework in construction. Dans: Construction Management and Economics, v. 18, n. 5 (juillet 2000).

    https://doi.org/10.1080/014461900407374

  29. Dong, Chao / Wang, Fan / Li, Heng / Ding, Lieyun / Luo, Hanbin (2018): Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project. Dans: Automation in Construction, v. 93 (septembre 2018).

    https://doi.org/10.1016/j.autcon.2018.05.014

  30. Xu, Zhao / Li, Suhao / Li, Heng / Li, Qiming (2018): Modeling and problem solving of building defects using point clouds and enhanced case-based reasoning. Dans: Automation in Construction, v. 96 (décembre 2018).

    https://doi.org/10.1016/j.autcon.2018.09.003

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine