Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates
Auteur(s): |
Liulin Kong
Heng Li Hanbin Luo Lieyun Ding Xiaochun Luo Martin Skitmore |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, septembre 2017, v. 81 |
Page(s): | 34-43 |
DOI: | 10.1016/j.autcon.2017.03.016 |
- Informations
sur cette fiche - Reference-ID
10190880 - Publié(e) le:
07.12.2018 - Modifié(e) le:
07.12.2018