General Information
Completion: | 1995 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Klosters-Serneus, Grisons, Switzerland Selfranga, Klosters-Serneus, Grisons, Switzerland |
---|---|
Near: |
Vereina Tunnel (1999)
|
Coordinates: | 46° 52' 3" N 9° 52' 50" E |
Coordinates: | 46° 51' 26" N 9° 52' 49" E |
Technical Information
Dimensions
tunnel length | 2 160 m | |
longitudinal slope | 4 % |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Geologie des Zugwald- und des Vereinatunnels. In: Schweizer Ingenieur und Architekt, v. 112, n. 44 (27 October 1994). (1994):
- Linienführung des Zugwald- und des Vereinatunnels. In: Schweizer Ingenieur und Architekt, v. 112, n. 44 (27 October 1994). (1994):
- Lockermaterialvortrieb im Zugwald-Tunnel. In: Schweizer Ingenieur und Architekt, v. 112, n. 44 (27 October 1994). (1994):
- TBM-Vortrieb im Zugwald-Tunnel. In: Schweizer Ingenieur und Architekt, v. 112, n. 44 (27 October 1994). (1994):
- About this
data sheet - Structure-ID
20014176 - Published on:
30/10/2004 - Last updated on:
28/05/2021