0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1989
Completion: 1991
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Carries:
  • Bundesstrasse B 8
Crosses:
  • Zenn River
Coordinates: 49° 29' 36.37" N    10° 46' 18.42" E
Show coordinates on a map

Technical Information

Dimensions

main span 44 m
total length 484 m
number of spans 11
bridge surface 6 389 m²
height above valley floor or water max. 12 m

Quantities

concrete volume 7 440 m³
prestressing steel 190 t
reinforcing steel 755 t

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20007189
  • Published on:
    10/12/2002
  • Last updated on:
    02/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine