0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2002
Status: in use

Project Type

Location

Location: , , ,
Location description:

This bridge allows a shunting track from the marshalling yards to cross the high-speed rail line from Madrid/Zaragoza to the French Brench at the western entrance to Zaragoza-Delicias Station.

Coordinates: 41° 39' 39.01" N    0° 55' 0.39" W
Show coordinates on a map

Technical Information

Dimensions

total length 124 m
main spans (2x) 37 m
span lengths 25 m - 2 x 37 m - 25 m
number of spans 4
horizontal radius of curvature min. 200 m
bridge surface 1 017 m²
height above valley floor or water 4.5 - 6.5 m
number of tracks 1
longitudinal slope 25 ‰
crossing angle 31°
deck deck width 8.2 m
girder depth 0.8 m

Quantities

substructure structural steel 33 t
concrete volume 810 m³
reinforcing steel 54 t
reinforcing steel content 67 kg/m³
superstructure structural steel 157 t
concrete volume 397 m³
reinforcing steel 41 t
reinforcing steel content 103 kg/m³

Design Loads

design speed 40 km/h
live load UIC 71 / IPF-75

Cost

cost of construction ca. Euro 670 000

Materials

piers reinforced concrete
pylons concrete-filled steel tubes
deck slab reinforced concrete
stay cables steel
girders steel girders encased in concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20030323
  • Published on:
    19/08/2007
  • Last updated on:
    01/09/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine