0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2018
Completion: 2022
Status: in use

Project Type

Construction method: Immersed tube method
Function / usage: Road tunnel
Structure: Immersed tube tunnel

Location

Location: , ,
Underneath of:
  • Han River
Coordinates: 32° 3' 34.88" N    112° 9' 55.13" E
Coordinates: 32° 3' 57.06" N    112° 13' 9.81" E
Show coordinates on a map

Technical Information

Dimensions

total length 5 400 m
number of lanes 6

Design Loads

design speed 60 km/h

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20085912
  • Published on:
    20/05/2023
  • Last updated on:
    20/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine