General Information
Status: | in use |
---|
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Two-span single-pylon cable-stayed bridge |
Construction method: |
Rotation around a vertical axis |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Material hybrid bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main bridge | ||
---|---|---|
span lengths | 41 m - 50 m - 163 m | |
pylon | height | 88.9 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2022): Key Technology for the Design of a Cable-Stayed Bridge in a High- Intensity Area. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, pp. 208-215.
- About this
data sheet - Structure-ID
20086939 - Published on:
15/09/2023 - Last updated on:
15/09/2023