General Information
Name in local language: | 武汉长江大桥 (Wǔhàn Chángjiāng Dàqiáo) |
---|---|
Beginning of works: | 1 September 1955 |
Completion: | 15 October 1957 |
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Motorway bridge / freeway bridge lower deck: Railroad (railway) bridge |
Location
Technical Information
Dimensions
width | 22.5 m | |
total length | 1 670 m | |
main spans | 3 x 128 m | |
number of spans | 9 | |
lower deck | number of tracks | 2 |
upper deck | number of lanes | 2 x 2 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Participants
Design
Structural engineering
Relevant Web Sites
Relevant Publications
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- About this
data sheet - Structure-ID
20006678 - Published on:
09/11/2002 - Last updated on:
25/01/2017