0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 武汉长江大桥 (Wǔhàn Chángjiāng Dàqiáo)
Beginning of works: 1 September 1955
Completion: 15 October 1957
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Yangtze River
Coordinates: 30° 33' 7.02" N    114° 17' 0.04" E
Show coordinates on a map

Technical Information

Dimensions

width 22.5 m
total length 1 670 m
main spans 3 x 128 m
number of spans 9
lower deck number of tracks 2
upper deck number of lanes 2 x 2

Materials

piers reinforced concrete
truss steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006678
  • Published on:
    09/11/2002
  • Last updated on:
    25/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine