General Information
Name in local language: | Viaduc de Woippy |
---|---|
Beginning of works: | November 1973 |
Completion: | November 1975 |
Duration of works: | 2 years |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Haunched girder bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Maizières-lès-Metz, Moselle (57), Grand-Est, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 49° 11' 45.55" N 6° 9' 26.70" E |
Technical Information
Dimensions
total length | 350 m | |
span lengths | 25 m - 40 m - 60 m - 100 m - 60 m - 40 m - 25 m | |
number of spans | 7 | |
deck | deck depth | 2.55 - 5.20 m |
deck width | 14.40 m | |
web thickness | 0.40 m | |
thickness of bottom flange | 0.15 - 0.70 m |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1973-1975)
Owner
Client
Design
Contractor
Rehabilitation (2007-2008)
Client
Structural engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A4 - Viaduc de Woippy. In: Bulletin annuel AFPC ( 1975), pp. 137-140.