0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Williams Creek (Shoup) Bridge

General Information

Completion: 17 November 2017
Status: in use

Project Type

Awards and Distinctions

2020 Merit Award  

Location

Location: , , ,
Address: NF021
Crosses:
  • Salmon River
Coordinates: 45° 5' 54.30" N    113° 53' 39.73" W
Show coordinates on a map

Technical Information

Dimensions

main span 68.28 m
total length 68.28 m
number of spans 1
number of lanes 2
abutments number 2

Quantities

structural steel 173 t

Cost

cost of construction United States dollar 6 500 000

Materials

arches weathering steel
abutments reinforced concrete
main girders weathering steel

Participants

Structural engineering
General contractor
Steel fabrication

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088657
  • Published on:
    03/06/2024
  • Last updated on:
    03/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine