0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Wilhelm-Kaufmann-Steg
Beginning of works: October 2010
Completion: July 2011
Status: in use

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Salzach River
Coordinates: 47° 46' 53.86" N    13° 4' 34.13" E
Show coordinates on a map

Technical Information

Dimensions

width 4.5 m
span 94.50 m
number of spans 1
abutments number 2
pylon height 28.00 m
angle of inclination 60°
number 1
stay cables number 2 x 4

Cost

cost of construction (incl. taxes) Euro 2 700 000

Materials

pylon steel
deck steel
abutments reinforced concrete

Participants

Owner
Architecture
Dynamic analysis
Structural engineering
Checking engineering
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20019565
  • Published on:
    16/02/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine