General Information
Other name(s): | Wiedtalbrücke |
---|---|
Completion: | 1999 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Neustadt (Wied), Neuwied (Kreis), Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Part of: | |
Next to: |
Wied Viaduct (1940)
|
Coordinates: | 50° 37' 3" N 7° 24' 41" E |
Technical Information
Dimensions
total length | 390 m | |
span lengths | 62.4 m - 5 x 65.44 m - 62.4 m | |
number of spans | 7 | |
height above valley floor or water | 50 m |
Quantities
concrete volume | 9 600 m³ | |
prestressing steel | 370 t | |
reinforcing steel | 1 150 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke der Neubaustrecke Köln-Rhein/Main. In: Eisenbahntechnische Rundschau ( 2000), pp. 7-12. (2000):
- About this
data sheet - Structure-ID
20001786 - Published on:
19/08/2001 - Last updated on:
16/06/2022