General Information
Name in local language: | Talbrücke Wettersbach |
---|---|
Beginning of works: | July 1990 |
Completion: | July 1993 |
Duration of works: | 3 years |
Status: | in use |
Project Type
Structure: |
Double-cell box grider bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Lateral / transverse launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Grünwettersbach, Karlsruhe, Baden-Württemberg, Germany |
---|---|
Carries: |
|
Part of: | |
Replaces: |
Wettersbach Viaduct (1938)
|
Coordinates: | 48° 58' 17.52" N 8° 27' 18.03" E |
Technical Information
Dimensions
deck | deck width | 40.5 m |
bridge surface | 7 918 m² | |
Northern bridge | ||
---|---|---|
total length | 195 m | |
span lengths | 35.0 m - 39.0 m - 55.0 m - 36.0 m - 30.0 m | |
number of spans | 5 | |
Southern bridge | ||
total length | 196 m | |
span lengths | 48.0 m - 2 x 57.0 m - 34.0 m | |
number of spans | 4 |
Quantities
deck | concrete volume | 2 x 2 900 m³ |
prestressing steel | 2 x 160 t | |
reinforcing steel | 2 x 420 t | |
substructure | concrete volume | 1 500 m³ + 1 800 m³ |
reinforcing steel | 165 t + 225 t |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | ca. German Mark 39 000 000 | |
cost of construction per m² | German Mark 4 925 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Checking engineering
-
Harrer Ingenieure VBI mbH
- Harrer (checking engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bau des Wettersbachviadukts. In: Beton- und Stahlbetonbau, v. 89, n. 5 (May 1994), pp. 136-139. (1994):
- Brücken der Bundesfernstraßen 1994. Verkehrsblatt-Verlag, Dortmund (Germany), 1994, pp. 87-98.
- About this
data sheet - Structure-ID
20001136 - Published on:
25/11/2000 - Last updated on:
13/02/2018