General Information
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Warren type truss bridge |
Material: |
Steel bridge |
Structure: |
main bridge: Continuous truss bridge main bridge: Pony truss bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaduct: Deck truss bridge approach viaduct: Continuous truss bridge |
Location
Location: |
Auckland, Auckland, New Zealand |
---|---|
Coordinates: | 36° 49' 20.87" S 174° 36' 57.54" E |
Technical Information
Dimensions
total length | 220 m | |
approach viaduct | ||
---|---|---|
total length | 120 m | |
span lengths | 20 - 23 m | |
deck | walkway width | 3.00 m |
main bridge | ||
total length | 100 m | |
span lengths | 16 - 20 m | |
deck | walkway width | 3.00 m |
truss | height | 1.7 - 3.5 m |
height | 2.0 m |
Materials
piers |
steel
|
---|---|
truss |
steel
|
Excerpt from Wikipedia
The Westgate Pedestrian and Cycle Bridge is a motorway overbridge crossing the Northwestern Motorway near Westgate in Auckland, New Zealand. Construction began in late 2012 and was completed in January 2013.
The 3-metre-wide (9.8 ft) bridge catering for both pedestrians and cyclists, as well as mobility-impaired users. It was designed and built by Jasmax architects, Aurecon Consulting Engineers and HEB Construction, and cost approximately $6 million, paid for by Auckland Transport and NZTA. The initial bridge works included work in the Manutewhau Walk Reserve on the eastern side of the bridge, including replacing pine trees with native trees.
Initially, the main function is to provide a west-east connection for the local area, though in the long run, it is intended to link into a future extension of the Northwestern Cycleway up to the bridge.
History
It was initially approved in the mid 2008s, as a response to a 2004 death of an 11-year-old boy hit by a van while he was crossing the motorway, and in response to continued illegal crossing over the motorway of several dozen people daily, trying to avoid long detours in reaching the nearby shopping centre west of the motorway from the suburbs to the east. However, from the time to approval until construction start, it took another four years until funding was allocated.
Text imported from Wikipedia article "Westgate Pedestrian and Cycle Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Relevant Web Sites
Relevant Publications
- Westgate Footbridge, Auckland, New Zealand. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071850 - Published on:
17/10/2016 - Last updated on:
02/12/2024