0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1932
Completion: 14 December 1933
Status: destroyed (7 April 1945)

Project Type

Location

Location: , , ,
Crossed:
  • Weser River
Replaced by: Höxter Bridge (1956)

Technical Information

Dimensions

span lengths 2 x 68.00 m
number of spans 2
roadway / carriageway width 6.00 m
walkway width 2 x 2.50 m
superstructure on-center distance between girders 7.50 m

Materials

superstructure steel
abutments reinforced concrete
pier reinforced concrete

Participants

Client
Design
Dynamic analysis
Steel construction
Concrete construction
Construction supervision

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20065921
  • Published on:
    31/01/2014
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine