General Information
Project Type
Structure: |
Twin girder bridge Haunched girder bridge Multi-span continuous girder bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Function / usage: |
Road bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wernshausen, Schmalkalden, Schmalkalden-Meiningen, Thuringia, Germany |
---|---|
Address: | B19 |
Coordinates: | 50° 42' 57.39" N 10° 22' 3.96" E |
Technical Information
Dimensions
total length | 627.70 m | |
span lengths | 51.00 m - 7 x 62.00 m - 58.00 m - 47.50 m | |
deck width | 11.50 m | |
number of spans | 10 | |
bridge surface | 7 216 m² | |
piles | diameter | 1.20 m |
Quantities
piles | total length of piles | 731 m |
substructure | concrete volume | 2 341 m³ |
reinforcing steel | 418 t | |
superstructure | structural steel | 1 420 t |
concrete volume | 3 203 m³ | |
reinforcing steel | 730 t |
Design Loads
design code(s) | DIN FB 101 |
Cost
cost of construction | Euro 13 260 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
cross beams |
steel
|
girders |
steel
|
Participants
Owner
Client
Design
Design consultants
Erection engineering
Soil investigation report
Checking engineering
- A. Rinke (checking engineer)
Co-contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2013. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2014, pp. 105-114.
- About this
data sheet - Structure-ID
20066880 - Published on:
28/02/2015 - Last updated on:
05/02/2016