Beginning of works: January 2010
Completion: 2013
Status: in use

Project Type

Location

Location: , , , ,
Address: B19
Coordinates: 50° 42' 57.39" N    10° 22' 3.96" E
Show coordinates on a map

Technical Information

Dimensions

total length 627.70 m
span lengths 51.00 m - 7 x 62.00 m - 58.00 m - 47.50 m
deck width 11.50 m
number of spans 10
bridge surface 7 216 m²
piles diameter 1.20 m

Quantities

piles total length of piles 731 m
substructure concrete volume 2 341 m³
reinforcing steel 418 t
superstructure structural steel 1 420 t
concrete volume 3 203 m³
reinforcing steel 730 t

Design Loads

design code(s) DIN FB 101

Cost

cost of construction Euro 13 260 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
cross beams steel
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20066880
  • Published on:
    28/02/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine