0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1958
Completion: 27 September 1960
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Balanced cantilever method
Structure: Haunched girder bridge
Material: Prestressed concrete bridge

Location

Location: , ,
Crosses:
  • Main River
Next to: Versorgungsbrücke Industriepark Höchst (2009)
Coordinates: 50° 5' 21.85" N    8° 32' 6.72" E
Show coordinates on a map

Technical Information

Dimensions

total length 250 m
span lengths 35.75 m - 130.00 m - 40.65 m - 24.50 m
number of spans 4
number of lanes 2
deck deck width 12.35 m

Materials

deck prestressed concrete

Case Studies and Applied Products

TENSA®FLEX RC – Sliding Finger joints

TENSA®FLEX RC – Sliding Finger joints

The Tensa®Flex slip finger can assimilate both horizontal and vertical movements and torsions. Modular structure makes possible the replacement of the system with minimum traffic interferences.

[more]

Participants

Initial construction (1958-1960)
Co-contractor
Rehabilitation (2016)
Owner
Expansion joints

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005232
  • Published on:
    20/09/2002
  • Last updated on:
    14/01/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine