General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Function / usage: |
Railroad (railway) bridge |
Construction method: |
Longitudinal launching |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wettingen, Argovia, Switzerland Neuenhof, Argovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 27' 23.23" N 8° 19' 14.82" E |
Technical Information
Dimensions
total length | 136.5 m | |
span lengths | 41.4 m - 53.7 m - 41.4 m | |
number of spans | 3 | |
number of tracks | 2 | |
track gauge | 1 435 mm | |
deck | deck depth | 4 720 mm |
girder depth | 3 500 mm |
Quantities
deck | structural steel | 351 t |
concrete volume | 586 m³ | |
reinforcing steel | 135 t |
Design Loads
design code(s) | SIA 161 |
Cost
cost of construction | Swiss Franc 9 300 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Design
Checking engineering
- H. R. Holenweg (checking engineer)
Co-contractor
Civil works
Resident engineering
Anti-corrosion protection
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Neubau Obere Limmatbrücke Wettingen der SBB. In: Schweizer Ingenieur und Architekt, v. 107, n. 9 (2 March 1989). (1989):
- About this
data sheet - Structure-ID
20080340 - Published on:
30/11/2020 - Last updated on:
06/12/2020