0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Neue Weinzödl-Brücke
Beginning of works: 1918
Completion: 3 December 1922
Status: in use

Project Type

Function / usage: Road bridge
Material: Reinforced concrete bridge
Structure: Vaulted arch bridge
Function / usage: Railroad (railway) bridge

Location

Location: , ,
Crosses:
  • Mur River
Coordinates: 47° 6' 22.95" N    15° 24' 4.40" E
Show coordinates on a map

Technical Information

Dimensions

total length 120 m
span lengths 3 x 33 m - 28 m
number of spans 4

Materials

arches reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20023858
  • Published on:
    18/10/2006
  • Last updated on:
    03/05/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine