0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1953
Completion: 16 May 1957
Status: in use

Project Type

Awards and Distinctions

1957 award winner  

Location

Location: , , ,
, , ,
Crosses:
  • Delaware River
Part of:
Coordinates: 39° 54' 33.49" N    75° 9' 11.75" W
Coordinates: 39° 54' 5" N    75° 6' 53.01" W
Show coordinates on a map

Technical Information

Dimensions

main span 610 m
total length 9.98 km
number of cables 2
clearance 46.5 m
span lengths of main bridge 234.7 m - 610 m - 234.7 m
number of lanes 7

Cost

cost of construction United States dollar 75 000 000

Materials

cables steel
piers reinforced concrete
pylons steel
deck truss steel

Participants

Initial construction
Owner
Design
Construction
Cables
Cable steel supplier
Rehabilitation
Consulting engineers

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000566
  • Published on:
    21/11/1999
  • Last updated on:
    18/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine