0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Waaki west-lokowaki Footbridge

General Information

Beginning of works: 2 August 2022
Completion: 11 October 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the R.Waaki river.
Coordinates: 1° 44' 0" N    31° 23' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 87 m

Materials

cables steel wire
deck steel

Notes

The bridge built by Bridges to Prosperity serves around 2900 people.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088172
  • Published on:
    11/04/2024
  • Last updated on:
    07/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine