0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2007
Completion: 10 October 2010
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Inn River
Coordinates: 46° 47' 21.48" N    10° 16' 55.78" E
Show coordinates on a map

Technical Information

Dimensions

total length 236 m
span lengths 59 m - 104 m - 73 m
number of spans 3
height above valley floor or water 70 m
roadway / carriageway width 6 m
walkway width 2 x 1.5 m

Cost

cost of construction Swiss Franc 15 900 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071816
  • Published on:
    14/10/2016
  • Last updated on:
    09/06/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine