0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: Spring 2018
Completion: Summer 2020
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Danube
Part of:
Next to: VÖEST Bridge (1972)
Coordinates: 48° 19' 10.75" N    14° 17' 57.96" E
Coordinates: 48° 19' 9.05" N    14° 17' 56.28" E
Show coordinates on a map

Technical Information

Dimensions

piles diameter 1.20 m
Eastern bridge
main span 132 m
total length ca. 420 m
number of lanes 2
Western bridge
main span 132 m
total length ca. 420 m
number of lanes 2

Materials

piers reinforced concrete
pylons steel
deck of main bridge steel
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20089633
  • Published on:
    22/10/2024
  • Last updated on:
    22/10/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine