General Information
Status: | project phase |
---|
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Box girder bridge |
Location
Technical Information
Dimensions
main bridge | ||
---|---|---|
width | 3.940 m | |
total length | 56.1 m | |
span lengths | 18.00 m - 24.00 m - 14.11 m | |
number of spans | 3 | |
walkway width | 3.780 m | |
deck | girder depth | 0.660 m |
Materials
deck |
steel
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2014): Enginyeria Reventós works in progress. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014.
- About this
data sheet - Structure-ID
20071945 - Published on:
21/10/2016 - Last updated on:
31/10/2016