General Information
Other name(s): | High-Level Bridge |
---|---|
Beginning of works: | May 1907 |
Completion: | 21 December 1907 |
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Structure: |
Three-hinged arch bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
1989 |
for registered users |
---|
Location
Location: |
Cambridge, Waikato, New Zealand |
---|---|
Address: | Victoria Street |
Crosses: |
|
Coordinates: | 37° 53' 57.29" S 175° 28' 27.04" E |
Technical Information
Dimensions
main span | 88 m | |
width | 5.2 m | |
height | 35.4 m | |
total length | 141 m | |
number of spans | 4 | |
number of lanes | 2 | |
abutments | number | 2 |
Materials
deck |
steel
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
pier |
steel
|
piers on arch |
steel
|
Participants
Design
- John Alexander Low Waddell (designer)
Relevant Web Sites
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 248. (2001):
- About this
data sheet - Structure-ID
20052102 - Published on:
15/01/2010 - Last updated on:
30/11/2024