General Information
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Construction method: |
Movable Scaffolding System |
Function / usage: |
Road bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Cofrentes, Valencia, Valencia, Spain |
---|---|
Address: | CN-330 |
Coordinates: | 39° 13' 51.65" N 1° 4' 30.80" W |
Technical Information
Dimensions
span lengths | 50 m - 6 x 70 m - 50 m | |
number of spans | 8 | |
deck | girder depth | 2.50 - 3.47 m |
piers | height | max. 50 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Organic motion. In: Bridge Design & Engineering, v. 16, n. 59 (2nd Quarter 2010), pp. 7.
- About this
data sheet - Structure-ID
20059110 - Published on:
14/11/2010 - Last updated on:
05/02/2016