General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Three-span cable-stayed bridge Cable-stayed bridge with semi-fan system |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bucaramanga, Santander, Colombia |
---|---|
Coordinates: | 7° 6' 29.42" N 73° 7' 47.41" W |
Technical Information
Dimensions
total length | 550.80 m | |
span lengths | 129.20 m - 292.40 m - 129.20 m | |
number of spans | 3 | |
number of lanes | 2 x 3 | |
deck | deck depth | 2.60 m |
deck width | 30 m | |
roadway / carriageway width | 2 x 10.50 m | |
pier P-2 | height | 52 m |
pier P-3 | height | 71.92 m |
pylon P-2 | total height | 113 m |
pylon height (above deck) | 61.00 m | |
pylon P-3 | total height | 133 m |
pylon height (above deck) | 61.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
pylons |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- Distintos sistemas de aislamiento empleados en puentes. In: Hormigón y acero, v. 68, n. 281 (1st Quarter 2017), pp. 45-55. (2017):
- Pandeo simultáneo de pilas de puente: aplicación a un cálculo sísmico tipo push-over de las pilas del puente atirantado de Bucaramanga en Colombia. In: Hormigón y acero, v. 63, n. 263 (1st Quarter 2012), pp. 65-82. (2012):
- About this
data sheet - Structure-ID
20075019 - Published on:
28/03/2018 - Last updated on:
09/11/2024