0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Status: under construction

Project Type

Location

Location:

Technical Information

Dimensions

bridge 1
main span 55 m
total length 405 m
longitudinal slope 4.71 %
minimum span length 37.5 m
bridge 2
main span 55 m
total length 350 m
longitudinal slope 4.84 %
minimum span length 37.5 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086663
  • Published on:
    22/08/2023
  • Last updated on:
    22/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine