General Information
Status: | under construction |
---|
Project Type
Construction method: |
Incremental launching using match cast method |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge Multi-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Azerbaijan |
---|
Technical Information
Dimensions
bridge 1 | ||
---|---|---|
main span | 55 m | |
total length | 130 m | |
number of spans | 3 | |
horizontal radius of curvature | 233 m | |
longitudinal slope | 4.71 % | |
minimum span length | 37.5 m | |
abutments | number | 2 |
piers | number | 2 |
bridge 2 | ||
main span | 55 m | |
total length | 185 m | |
number of spans | 4 | |
horizontal radius of curvature | 266 m | |
longitudinal slope | 4.66 % | |
minimum span length | 37.5 m | |
abutments | number | 2 |
piers | number | 3 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Contractor
Prestressing
Bearings
Expansion joints
Launching
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2023): Incremental Launching Method in a challenging geography: Ahmetbeyli-Fuzuli-Şuşa Motorway Project. Presented at: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, pp. 134-140.
- About this
data sheet - Structure-ID
20086662 - Published on:
23/08/2023 - Last updated on:
23/08/2023