General Information
Completion: | December 1992 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Construction method: |
Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Gor, Granada, Andalusia, Spain |
---|---|
Address: | N-342 |
Coordinates: | 37° 23' 35.67" N 2° 59' 42.17" W |
Technical Information
Dimensions
total length | 390.00 m | |
span lengths | 38.00 m - 6 x 52.00 m - 38.00 m | |
number of spans | 8 | |
height above valley floor or water | 85 m | |
deck | deck depth | 3.50 m |
deck width | 2 x 13.00 m | |
web thickness | 0.40 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducto sobre el río Gor. In: Hormigón y acero, v. 45, n. 192 (3rd Quarter 1994), pp. 107-116. (1994):
- About this
data sheet - Structure-ID
20076371 - Published on:
12/11/2018 - Last updated on:
12/11/2018