General Information
Completion: | 1979 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Construction method: |
Precast segmental construction using launching gantry |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Torcy, Seine-et-Marne (77), Ile-de-France, France |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 48° 50' 20.37" N 2° 38' 56.60" E |
Technical Information
Dimensions
total length | 570.60 m | |
deck | deck depth | 2.00 m |
deck width | 11.00 m | |
length of precast segments | 2.40 m | |
cross-sectional area | 8.25 m² | |
viaduct 1 | ||
---|---|---|
span lengths | 31.30 - 3 x 32 m = 127.30 m | |
number of spans | 3 | |
viaduct 2 | ||
span lengths | 32 - 7 x 36 - 32 m = 316.00 m | |
number of spans | 1 | |
viaduct 3 | ||
span lengths | 3 x 32 - 31.30 m = 127.30 m | |
number of spans | 1 |
Quantities
deck | prestressing steel | 48.6 kg/m³ |
reinforcing steel | 110 kg/m³ |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Architecture
- Cabinet Arsac
- Auguste Arsac (architect)
Technical advisor to the client
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- RER A - Viaduc du Ru de Maubuée. In: Bulletin annuel AFPC ( 1978- 1979), pp. 367-371.
- Viaduc du Ru de Maubuée (ligne A du RER). Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 64.
- About this
data sheet - Structure-ID
20008240 - Published on:
14/02/2003 - Last updated on:
02/01/2018