0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1976
Completion: 1977
Duration of works: 275 days
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , , ,
Part of:
Replaces: Old Claps Viaduct (1894)
Coordinates: 44° 36' 10.65" N    5° 27' 23.32" E
Show coordinates on a map

Technical Information

Dimensions

span lengths 54.05 m - 2 x 54.50 m - 54.05 m
number of spans 4
girder on-center distance between girders 3.30 m
girders girder depth 2.70 m

Quantities

structural steel 570 t

Materials

girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010883
  • Published on:
    06/12/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine