General Information
Status: | in use |
---|
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Ussel, Corrèze (19), Nouvelle-Aquitaine, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 45° 30' 59.49" N 2° 19' 14.05" E |
Technical Information
Dimensions
total length | 218 m | |
span lengths | 42 m - 52 m - 60 m - 64 m | |
number of spans | 4 | |
pier height | 15 - 18 m | |
number of casting stages | 68 | |
deck | deck width | 23.24 m |
casting length of deck | 2.55 m |
Quantities
concrete volume | 6 700 m³ | |
prestressing steel | 155 t | |
reinforcing steel | 920 t |
Cost
construction cost (without tax) | Euro 4 900 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'autoroute sous l'emprise du paysage. In: Construction moderne ( 2000), pp. 8-16. (2000):
- La Sarsonne. En dévers sur trois piles. In: Travaux, n. 768 (October 2000), pp. 51.
- About this
data sheet - Structure-ID
20007127 - Published on:
07/12/2002 - Last updated on:
05/02/2016