0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1976
Completion: 1977
Status: in use

Project Type

Structure: Single-cell box girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge
Construction method: Precast segmental construction

Location

Location: , , , ,
Coordinates: 43° 27' 30.97" N    1° 32' 56.73" W
Show coordinates on a map

Technical Information

Dimensions

total length 485 m
span lengths 40 m - 45 m - 6 x 60 m - 40 m
number of spans 9
bridge surface 4 524 m²
deck width 10.12 m
deck depth 3 m
web thickness 0.36 - 0.50 m
thickness of bottom flange 0.20 - 0.60 m

Quantities

concrete volume 2 985 m³
prestressing steel 39.9 kg/m³
reinforcing steel 111.6 kg/m³

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010691
  • Published on:
    21/11/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine