General Information

Other name(s): Viaduc du Haut Plateau
Beginning of works: July 2018
Completion: July 2020
Duration of works: 2 years
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Orne
Coordinates: 49° 11' 42.69" N    0° 18' 44.27" W
Show coordinates on a map

Technical Information

Dimensions

main span 83 m
length 145 m
span lengths 62 m - 83 m
number of spans 2
girder depth 2.30 - 3.80 m

Cost

construction cost (without tax) Euro 7 000 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20082067
  • Published on:
    11/03/2022
  • Last updated on:
    10/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine