General Information
Other name(s): | Viaduc du Haut Plateau |
---|---|
Beginning of works: | July 2018 |
Completion: | July 2020 |
Duration of works: | 2 years |
Status: | in use |
Project Type
Material: |
Steel-concrete composite bridge |
---|---|
Function / usage: |
Tramway, light or metro rail bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Haunched girder bridge Twin girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Colombelles, Calvados (14), Normandy, France Hérouville-Saint-Clair, Calvados (14), Normandy, France |
---|---|
Crosses: |
|
Coordinates: | 49° 11' 42.69" N 0° 18' 44.27" W |
Technical Information
Dimensions
main span | 83 m | |
length | 145 m | |
span lengths | 62 m - 83 m | |
number of spans | 2 | |
girder depth | 2.30 - 3.80 m |
Cost
construction cost (without tax) | Euro 7 000 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Architecture
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20082067 - Published on:
11/03/2022 - Last updated on:
10/01/2023