General Information
Completion: | 1982 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bellegarde-sur-Valserine, Ain (01), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: |
|
Coordinates: | 46° 5' 56.35" N 5° 49' 41.61" E |
Technical Information
Dimensions
total length | 238.149 m | |
span lengths | 38.799 m - 4 x 40.00 m - 39.35 m | |
number of spans | 6 | |
girder depth | 2.17 m | |
deck | deck width | 11.00 m |
Quantities
prestressing steel | 86 t (33 kg/m³) | |
reinforcing steel | 354 t (136 kg/m³) | |
deck | concrete volume | 2 603 m³ |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A40 - Viaduc de Bois d'Arlod (Ain). In: Travaux, n. 606 (January 1986), pp. 93.
- A40 – Viaduc de Bois d'Arlod. In: Bulletin annuel AFPC ( 1983- 1984), pp. 127-132.
- About this
data sheet - Structure-ID
20007403 - Published on:
03/01/2003 - Last updated on:
13/06/2017