General Information
Completion: | November 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Auxonne, Côte-d'Or (21), Bourgogne-Franche-Comté, France Les Maillys, Côte-d'Or (21), Bourgogne-Franche-Comté, France |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 47° 10' 13.85" N 5° 21' 19.96" E |
Technical Information
Dimensions
total length | 552 m | |
span lengths | 52 m - 77 m - 136 m - 77 m - 55 m - 55 m - 55 m - 45 m | |
number of spans | 8 | |
pier height | 4.80 - 7.60 m | |
web thickness | 0.40 m | |
deck | deck depth | 3.20 - 6.50 m |
deck width | 12 m |
Quantities
reinforcing steel | 1520 t (148 kg/m³) | |
internal prestressing | 260 t (25 kg/m³) | |
external prestressing | 325 t (32kg/m³) | |
deck | concrete volume | 10 300 m³ |
foundations | concrete for foundations | 7 300 m³ |
piers | concrete for piers | 2 200 m³ |
Cost
cost of construction (incl. taxes) | French Franc 126 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Architecture
- Cabinet Fraleu
- Philippe Fraleu (architect)
- Pierre Loyer (architect)
Structural engineering
Main contractor
Co-contractor
Subcontractor
Foundations
Earthworks
Prestressing
Reinforcing steel
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A39 - Viaduc d'Auxonne et des Maillys (Côte-d'Or). In: Travaux, n. 700 (July - August 1994), pp. 19-26. (1994):
- About this
data sheet - Structure-ID
20007929 - Published on:
29/01/2003 - Last updated on:
03/04/2017