0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Newcastle-Vermillion Bridge
Beginning of works: 19 June 2000
Completion: 1 November 2001
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Missouri River
Coordinates: 42° 43' 6.65" N    96° 57' 4.05" W
Show coordinates on a map

Technical Information

Dimensions

main span 70 m
total length 748.3 m
number of spans 12
number of lanes 2
deck deck width 11 m

Cost

cost of construction United States dollar 12 500 000

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Chronology

19 June 2000

Bridge construction begins.

1 November 2001

Bridge is opened to traffic.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20007622
  • Published on:
    07/01/2003
  • Last updated on:
    27/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine