Dimensions
main span | 120 m | |
length | 630 m |
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location: |
Metsovo, Ioannina, Epirus, Greece Grevena, Grevena, West Macedonia, Greece |
---|---|
Address: | A2 |
Part of: | |
Coordinates: | 39° 58' 48.64" N 21° 22' 15.08" E |
main span | 120 m | |
length | 630 m |
Currently there is no information available about persons or companies having participated in this project.
There currently are no relevant websites listed.