General Information
Completion: | 1902 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Vaulted arch bridge |
Material: |
Masonry bridge |
Location
Location: |
Bergün/Bravuogn, Bergün Filisur, Grisons, Switzerland |
---|---|
Part of: | |
Coordinates: | 46° 37' 4.08" N 9° 45' 42.91" E |
Technical Information
Dimensions
height | 40 m | |
length | 102 m | |
span lengths | 3 x 21 m - 2 x 8 m | |
number of spans | 5 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le chemin de fer Rhétique, 1889-1999. Les Editions du Cabri, Switzerland (Switzerland). :
- About this
data sheet - Structure-ID
20025533 - Published on:
05/12/2006 - Last updated on:
08/11/2017