0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Uwumugeti-Kigusa Trail Bridge

General Information

Beginning of works: 20 June 2020
Completion: 22 September 2020
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Nyirankumbure river.
Coordinates: 2° 32' 26.72" S    29° 30' 13.45" E
Show coordinates on a map

Technical Information

Dimensions

span 55 m

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 2762 people.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084802
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine