General Information
Completion: | 1981 |
---|---|
Status: | in use |
Project Type
Structure: |
Deck arch bridge |
---|---|
Material: |
Reinforced concrete bridge |
Construction method: |
Cantilever construction using temporary cable-stays |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 332.500 m | |
arch | width | 17.800 m |
arch span | 204 m | |
thickness | 3.600 - 4.000 m | |
deck | deck width | 21.90 m |
temporary works | ||
---|---|---|
rock anchors | total length | 4 089 m |
Quantities
concrete volume | 41 300 m³ | |
reinforcing steel | 2 150 t | |
temporary works | ||
---|---|---|
arch | structural steel | 1 090 t |
pylons | structural steel | 121 t |
stay cables | steel for cable-stays | 690 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of Usagawa long-spanned concrete arch bridge. Presented at: 12th IABSE Congress, Vancouver, BC, Canada, 3-7 September, 1984, pp. 1013-1020. (1984):
- Usagawa Bridge on the Chugoku Expressway (Japan). In: IABSE Structures, v. 7 ( 1983). (1983):
- 流動化コンクリートによる中国自動車道宇佐川橋の施工 (Construction of Usagawa Bridge, Chugoku Expressway, by Use of Superplasticisized Concrete). In: Concrete Journal (JCI), v. 20, n. 10 ( 1982), pp. 42-50. (1982):
- About this
data sheet - Structure-ID
20006667 - Published on:
08/11/2002 - Last updated on:
01/02/2018