0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1872
Completion: 1874
Status: destroyed (1945)

Project Type

Location

Location: , ,
Crossed:
  • Main River
Replaced by: Untermainbrücke (1949)

Technical Information

Dimensions

span lengths 11.00 m - 17.12 m - 31.40 m - 32.40 m - 31.98 m - 32.30 m - 31.40 m - 15.36 m - 12.45 m - 11.18 m - 10.19 m
number of spans 11

Cost

cost of construction Reichsmark 1 100 000

Materials

arches steel

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005225
  • Published on:
    20/09/2002
  • Last updated on:
    10/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine