0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ulm–Neu-Ulm Railroad Bridge

General Information

Beginning of works: 2004
Completion: 2007
Status: in use

Project Type

Location

Location: , ,
, , ,
Crossed:
  • Danube
Coordinates: 48° 23' 34.67" N    9° 59' 18.84" E
Coordinates: 48° 23' 35.15" N    9° 59' 19.33" E
Show coordinates on a map

Technical Information

Dimensions

Northern bridge
main span 58 m
total length 123 m
number of spans 3
number of tracks 1
track gauge 1 435 mm
abutments number 2
piers number 2
Southern bridge
main span 58 m
total length 123 m
number of spans 3
number of tracks 1
track gauge 1 435 mm
abutments number 2
piers number 2

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20065051
  • Published on:
    04/04/2013
  • Last updated on:
    22/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine