0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 20 March 2003
Status: in use

Project Type

Location

Location: , ,
Coordinates: 35° 26' 19.20" N    136° 47' 47.13" E
Show coordinates on a map

Technical Information

Dimensions

total length 469 m
deck deck width 28.3 - 29.1 m
approach viaduct
total length 315 m
main bridge
total length 154 m
span 154 m
pylon height 60 m

Cost

cost of construction ca. Japanese yen 10 200 000 000

Materials

pylon steel
deck steel
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20087603
  • Published on:
    08/12/2023
  • Last updated on:
    09/12/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine