• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Turtle Bay Sundial Bridge

General Information

Completion: 4 July 2004
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 40° 35' 32.60" N    122° 22' 39.08" W
Show coordinates on a map

Technical Information

Dimensions

main span 150 m
total length 230 m

Cost

cost of construction United States dollar 19 700 000

Materials

cables steel
deck truss steel
deck slab glass

Chronology

4 July 2004

The bridge is opened.

Participants

Design
Wind tunnel testing
General contractor
Steel construction
Project management

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002419
  • Published on:
    22/11/2001
  • Last updated on:
    24/04/2016