0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tunnel sous-fluvial des Invalides

General Information

Beginning of works: November 1973
Completion: November 1975
Status: in use

Project Type

Structure: Immersed tube tunnel
Function / usage: Metro tunnel / subway tunnel
Construction method: Immersed tube method

Location

Location: , ,
Underneath of:
  • Seine River
Part of:
Coordinates: 48° 51' 49.33" N    2° 18' 53.28" E
Show coordinates on a map

Technical Information

Dimensions

immersed tube unit width 8.60 m
length 32 m
number 4

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20010696
  • Published on:
    21/11/2003
  • Last updated on:
    14/09/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine