General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Berlin-Rudow, Neukölln, Berlin, Germany Berlin-Altglienicke, Treptow-Köpenick, Berlin, Germany |
---|---|
Part of: | |
Coordinates: | 52° 24' 44.71" N 13° 31' 25.46" E |
Coordinates: | 52° 25' 15.24" N 13° 31' 18.97" E |
Technical Information
Dimensions
total length | 960 m | |
number of lanes | 2 x 3 | |
number of tubes | 2 | |
tunnel | length | 900 m |
Quantities
reinforcing steel | 11 550 t | |
volume of extracted material | 200 000 m³ | |
volume of earthworks | 450 000 m³ | |
diaphragm wall | concrete volume | 43 500 m³ |
Median wall & ceiling | concrete volume | 52 650 m³ |
Cost
cost of construction | Euro 37 370 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Client
Design
Architecture
- Hans-Günther Burkhardt (architect)
Structural engineering
Consulting engineers
Geotechnical/geological experts
Checking engineering
-
BUNG Ingenieure AG
- Andreas Graichen (checking engineer)
-
Rostalski + Gräter Ingenieurgesellschaft mbH
- Traugott Rostalski (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2009. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-61-3, 2009, pp. 141-157.
- About this
data sheet - Structure-ID
20038659 - Published on:
04/08/2008 - Last updated on:
28/05/2021